Progressive-ratio schedule
Also called PR schedule, Break point
A schedule in which the response requirement increases after each reinforcer until responding stops. The last requirement completed is the break point, a measure of how much work a reinforcer will maintain.
Example
Requirements rise from 1 to 2, 4, 8 and 16 responses; a learner stops after completing 8 for pretzels but completes 32 for chips.