cumulative

Progressive-ratio schedule

Also called PR schedule, Break point

A schedule in which the response requirement increases after each reinforcer until responding stops. The last requirement completed is the break point, a measure of how much work a reinforcer will maintain.

Example

Requirements rise from 1 to 2, 4, 8 and 16 responses; a learner stops after completing 8 for pretzels but completes 32 for chips.

Where it comes up on the outline

Related terms

All terms

Type to search all 104 guides and the glossary.