Chained schedule
Also called chain
A compound schedule in which two or more basic schedules occur in a fixed order, each signaled by its own stimulus. Completing one component produces the stimulus for the next, which acts as a conditioned reinforcer, and the terminal reinforcer is delivered only after the final component.
Example
A pigeon pecks a red key 20 times (FR 20), which turns the key green; the first peck on the green key after one minute (FI 1 min) produces food.